Thursday, 1 January 2009
Evesham Vale Light Railway...
Monday, 29 December 2008
"The Severn Valley Limited" Dining Train...
The departure time of 2:15pm arrived and yet there was still no sign of 42968.At 2:26pm the Mogul arrived and shrewly coasted into the platform.The road was set straight away and 7812 barked gracefully out of Platform 1.Minestronie was served and was duly polished off! The waiters took away the bowls before other waiters brought around ready-heated plates.Yet more waiters then arrived with varying full dishes of delicious food! I finally ended up with sprouts, roast potatoes, new potatoes, peas, carrots, corn, pork, stuffing, sausages-in-bacon and of course, gorgeous gravy! This 2nd course was then followed by rubard crumble and hot custard for desert and coffee/tea and an after dinner mint made up the 4th course. Oh, plus a hot mince pie! By the time we'd received our mince pies we'd passed Bewdley and were almost back at Kidderminster.7802 was waiting in the coaling road as 7812 rolled into Platform 2.
Monday, 24 November 2008
Exhibiting My Lego Model Railway at Warley 2008!
Monday, 3 November 2008
Sunday At Shackerstone
Sunday, 2 November 2008
A Day To Remember....On The B1 "Mayflower"!
1306 was in her stride and it was clear that the driver wasn't listening very carefully to the engine as there was no way of seeing the road ahead! This was somewhat un-nerving but also quite fun. The dynamo's under the coaches kept the compartments lit as we made our way to Shenton. Along the way, we saw many firework displays from villages around the area but nothing else! A walker on Market Bosworth bridge seemed surprised as we coasted under the station bridge and through the platform. The man who we could see in his armchair in the station house didn't seem to bat an eyelid as we rumbled through though!! 1306 then accelerated for the 1 & 3/4 miles to Shenton. On arrival I took the staff to the guard whilst a Dracula sort of character followed my footsteps! We then ran round before receiving "Line-Clear" into Platform 1 at Shackerstone. We left on time but there was one more surprise in store!! At the distant signal, around 1 mile from Shackerstone, we halted, following instructions to do so of course!! Then, in turn, all of the lights in the coaches went out. This must of been scary for some of the passengers! Meanwhile, the cab was still illuminated by the steam driven lights! Following instruction from the guard, we set off again and the lights came back on in the train! Phew! We arrived back at a very wet & windy Shackerstone before I uncoupled 1306 and we ran up to the Signal Box. We then meandered through the points and back to No11 (the Dock Road). 1306 was then driven backwards up the yard and into the shed. With the shed doors shut behind her and all safety precautions for disposal having been carried out, we left 1306 to rest ready for her work the next day.
I thanked my crew and headed to the Bonfire & BBQ which was in full swing! Many passengers commented to us on the fantastic experience they had had that evening. Its always pleasing to hear such comments! My day, I believe, had been my best yet. 5 trips of the line on "Mayflower", 1 of which was in complete darkness! What could be better! With the time now 8pm I was ready for a sit down in the Bar Coach "Jessie" and I managed this shortly afterwards! What a day...I'm very looking forward to the next time. Thank you to 1306s Owner, Support Crew & the engine herself for a fantastic and memorable day!
Sunday, 19 October 2008
More Trains In The Garden...
Saturday, 18 October 2008
Driving 5" Gauge at Midlands Model Engineering 2008
Sunday, 12 October 2008
Another Day On "Thomas The Tank Engine"...
Here there is a 10mph slack so there was a chance to build the fire a little more with a couple of shovel fulls thrown into the middle of the grate.Once out of the 10mph the driver accelerated again so the firedoors were shut along with the injector feeds.The 5mph slack was soon seen and at 145psi we coasted through with the doors shut.Once out of the "5" the driver accelerated once more but the pressure rose a little too.Climbing towards Shackerstone towards Hedley's crossing it was time for another "3 under the back" and "3 over the front".Even though it was hard work I was having a very good time! The driver shut off at the top of the bank but with 2/3 of a glass of water we left the feed off,as well as only having 140psi.Under Barton Bridge we went and No2 signal was clear.The pressure was again rising as Jan handed the 'single line token' over to the signalman at Shackerstone.On arrival in Platform 2 the injector was put on again and the doors opened a crack to calm the safety valves down.Meanwhile,I got down from the footplate to uncouple."Thomas" then,after moving through the North End points,passed Signal No7 and proceeded to the preparation yard for disposal. After disposing of the engine we all headed to the Mess Room to sign off.
All in all it had been a very good day with the highlight for me being able to fire the last run back to Shackerstone.Thanks for that Jan! Couldn't have done it without your guidance!
Saturday at Shackerstone
Today I was at Shackerstone again and it was day out with Thomas.0-6-0 Hunslet "Jessie" (of the Llangollen Railway) was playing Thomas.After signing on 6:45am myself and Joe prepared a fire to complete the nealing of tubes.Nigel & Mr Britt were preparing Thomas whilst we worked. The fire was lit and began to heat up. Once Thomas had gone off shed at around 9:30am, Dave & Joe brought the Class 02 shunter into the South Yard before dragging "Lamport No3","Sir Gomer" & the Lowmac wagon (full of tubes) out of the shed.
Throughout the day myself and Dave nealed the tubes whilst Joe had a go at cleaning up the front tube plate.B1 "Mayflower" passed us every now and again with the services to Shenton.Joe left around 1pm but myself and Dave continued with the tubes.By around 2:30pm we put the last completed tubes on the Lowmac.We then used the 02 again to push the cavalcade back into the shed.The fire was left to burn down for an hour or so before I got the hose on it! This would dampen down the ash of course so that there would be less dust. Dave then headed up to the station whilst I 'pumped' the outside inspection pit due to the fact that the day was wearing on and a few hours later Thomas would be over the pit.I then got treated to a footplate ride to Shenton and back on Thomas' footplate with the "Tea on Thomas" special.It was good run and "Jessie" proved herself to be very powerful and reliable.I would be on the engine all day the following day and the post about that will come very soon!
Sunday, 5 October 2008
Back to Shack...
The day's main train motive power was the Class 20 (20 166 "River Fowey"). By just gone 12pm a big fire consisting of paper, pallets, coal, cardboard, oily rags & sleepers(!) had been lit in the preparation yard.Myself, Andy, Mr Britt, Dave, Joe & Graeme were going to have a go at nealing some more tubes.The fire was a bit bigger this time and by 1pm it was roaring and the first 12 tubes were in the fire.(This was of course after myself & Mr Britt had brought the Class 02 shunter around to the back of the shed to drag "Lamport", "Sir Gomer" & the Lowmac out!!).We had no gas equipment this time so it would take a little longer but as the hours went by more and more tubes were nealed.(We think we're very nearly 2/3 of the way there now.Another days worth of that and we'll be finished!). By 5pm we'd all had enough and the last nealed tube was put back on the Lowmac.
Mr Britt then restarted the 02 and myself & Andy "watched him back" into the shed.It had been another long day but more progress had been made.Myself, Mr Britt, Andy & Joe then retired to the washroom to 'sign off' (doing so at 5:30pm), after passing a very clean & shiny "Blue Circle"! I'll be back at Shack this coming Friday and staying over until Sunday night due to the Thomas Event.I am rostered on as 'trainee' on Thomas on Sunday so that should be fun!Meanwhile, on Saturday myself and Joe will be finishing the nealing of the tubes! Thanks for reading everyone and have a good evening!