Leaving GEC at 5:15pm, I got home in good time, ready to unload the loco and put my things away. I must admit, a very enjoyable afternoon. The loco will next be at GEC on Saturday August 6th, hopefully taking part in some public running. Thanks for reading folks, and thank you to the GEC for once again making me very welcome. Evening all. Sam...
Sunday, 24 July 2011
Achilles Report No3: An Outing To The GEC...
Leaving GEC at 5:15pm, I got home in good time, ready to unload the loco and put my things away. I must admit, a very enjoyable afternoon. The loco will next be at GEC on Saturday August 6th, hopefully taking part in some public running. Thanks for reading folks, and thank you to the GEC for once again making me very welcome. Evening all. Sam...
Sunday, 17 July 2011
Achilles Report No2: Eventful Afternoon at RPMR...
Evening all...
Thursday, 14 July 2011
Mablethorpe Model Railway...
Wednesday, 13 July 2011
Seaside Potential...
Tuesday, 12 July 2011
Steaming Along The Cleethorpes Coast...
Well, thats all folks; a beautiful seaside railway. Good evening...
Saturday, 9 July 2011
Monday, 4 July 2011
Flying Visit to GEC...And a Drive on "James"!...
Sunday, 3 July 2011
Achilles Report No1: First Maintainence...
Afternoon all. I've spent a few hours in the workshop this morning, sorting out "Achilles" after her run yesterday. First job, check the gauge glass; it was a little suspect yesterday but sorted itself out after we removed some grime from the top gland. Next job, the front end. With the loco on the work-bench its easier to get inside properly. I opened the door and shone the light inside the smokebox. There was plenty of ash inside, worsened in fact when I swept the boiler tubes. The smokebox was then hoovered out...the best way to do this dirty job! With the smokebox relatively clean, I replaced the mesh which forms the spark arrestor. Once fitted and realligned so that it missed the blast pipe nozzle, I checked the arrestor again before shutting the door. All seemed well. Therefore, the loco was cleaned up before being put away again. Her next run is planned for July 17th at CMES. Good day all.
The Most Generous Gift...
Hi guys. Hope everyone is well. Today I was up at Coventry Model Engineering Society for another 'Play Day' on 0-6-0T "Achilles". However, it turned into something much more, as ownership of the 5" gauge tank engine has now transferred to me. The loco's builder, Ken, has given me the most generous gift that I have ever received, and I am forever endebted to him for doing so. The honour is huge. About the loco: "Achilles" was finished in the early 1990s after being built over a period of 3 years. The loco has worn its blue livery since completion, though she has been recoated since. The name "Achilles" derives from one of the cruisers which fought in the Battle of the River Plate. The loco itself is designed by Reeves. Reeves did a powerful 0-4-0 called the 'Ajax' class, which was very popular. Following the popularity of 'Ajax', a second design was created which embodied a third driving axle, creating a chunky 0-6-0 with better adhesion than 'Ajax'. The loco is strong and runs well, as well as being free-steaming. In the future, I hope to run "Achilles" many times, in as many different places as possible! However, I am aware of the work and responsibility involved in owning a loco such as this. The opening image shows myself and Ken aboard "Achilles", prior to the hand-over. I am so pleased, I really am. Thank you, Ken; thank you so much. Look out for more runs with "Achilles" in the near future; she is planned to steam on July 17th at RPMR and on August 6th at GEC. Thank you all. Sam :)
Subscribe to:
Posts (Atom)

